Fire Hose Maintenance machine – rolling the hose
Last step is to roll the host and after that it can be loaded back to the fire truck. Sound level: 74…

During the construction work for the tram lines the main road of the city of Tampere has been (and will continue to be for some time) under a constant construction work. People can go over the street only in handful of places. One such place is near the eastern end of the Hämeensilta bridge.
The recording is done towards the railroad station at the end of the road. Workers are finishing the stone pavement. Historically the main road has been covered with cobblestone, which is not the best material for public transport (or the passangers teeth), so the trams are supposed to cure this problem. At the recording there is also the sound of concrete mixer. During recording people are walking behind the microphone talking in different dialects and languages.
Photo, film and sound recording: Kimmo Kestinen
Last step is to roll the host and after that it can be loaded back to the fire truck. Sound level: 74…
A wall clock manufactured by IKEA, situated in the kitchen. It has a wooden frame and Roman numerals. Purchased in the 1990s.…
This driving force was located in the Turners’ Hall of the Compagnie des Bronzes, in Brussels, and would date from the late…
Looking towards the harbor one sees a large bridge with heavy traffic on it. This is the fastest route for heavier traffic…