The sewage treatment plant (7): the sand pit – the sand removal building
Soundscape recorded in the sand removal building. The installation is used for the final removal of sand from sewage (about 6 tonnes…
Soundscape recorded in the sand removal building. The installation is used for the final removal of sand from sewage (about 6 tonnes…
Sounds recorded at a place where sewage, after going through the sand trap, flows into the sand removal installation. The sand trap…
Soundscape recorded in the fine screen hall. Sewage goes through 6 mm fine screens. Every day, about 3 tonnes of impurities are…
Sounds recorded above the main pumping station where sewage is pre-treated on fine screens. The pumps elevate the sewage to a height…
Soundscape recorded in the coarse grid hall. This is the first stage of mechanical sewage treatment. 30 mm grids retain larger solid…
Sounds recorded over the sewage inlet channel from Krakow central sewage system. On sunny days, approximately 165,000 m3 sewage goes through it…
Soundscape recorded in the control room of the Płaszów Sewage Treatment Plant. It is fitted with operator stations and a synoptic table…
Sounds of the sludge thickening press. ZUW Rudawa also handles sludge generated in the water treatment process (sludge from sedimentation in post-coagulation…
Soundscape recorded in the hall of the treated water pumping station. A set of pumps and auxiliary devices suck treated water from…
Operation of the chlorine dioxide production generators for water disinfection. A chemical reaction occurs in the generators; as a result of mixing…
Sounds recorded as the water goes through carbon filters. Filtration on a bed with active carbon improves the colour and taste of…
The sound of the sand filter aeration process was recorded in the intermediate pumping station in the filter building. At this point,…
The sounds recorded at the completion of the aeration and rinsing process of the filter bed in the sand filter building. The…
After aeration and rinsing of the filter, the impurities and the backwash go into the pipes and then into the desludger. The…
The sound was recorded in the course of rinsing the sand filter bed. The recording was made at the Rudawa Water Treatment…
The sound was recorded in the course of aerating the sand filter. Water from the settling tank where most suspended matter was…