construction Construction site shopping mall

Outside The Ratina Mall

The Ratina Shopping mall construction started on April 2016 and ended in April 19, 2018. The mall is located between Tampere Ratina Stadium and the Tampere bus station.

Cars, footsteps, bikes, a man talking about the building and audible pedestrian signals can be heard in the background.

Sound recorder, video recorder, photographer: Mikael Maffei

Specs:

Decade:
Filesize:
Duration:
Channels:
2010s
12.6 MB
1 min 11 s
2 (Stereo)
Sample rate:
Bit rate:
Bit depth:
Level:
44.1 kHz
1411 kb/s
16 bit
65 dB

Recorded on April 20, 2018
Ratina Mall
Tampere, FINLAND
Creative Commons License