Stuttgart 21 XX: Tunnel Lining II at Tunnel Construction at Ulmer Straße

Stuttgart 21 is one of the biggest construction projects in Germany. It includes the underground construction of a new central station for the city of Stuttgart as well as the creation of a new network of tracks and tunnels that allows high speed trains to pass in the area, possibly reduces travelling times and connects Stuttgart to international transport networks. It is conducted by Deutsche Bahn and co-financed by public money.
However, despite enthusiasm from its founders and the industry, the project has been heavily criticised. Not only has it become much more expensive than expected, but there are also doubts about the efficiency and safety of the new central station as well as about the actual benefit of the high speed tracks. Moreover, the construction fuelled protests and many discussions on protected buildings and nature reserves within the city such as historic parks.
Large parts of the train tracks arriving at the new station will run through underground tunnels. One of the construction sites was at Ulmer Straße just outside of the city centre. There the tunnel is expanded by blasting. Whenever a new part of the tunnel has been blasted and cleared it is lined with layers of shotcrete and steel grids. In this recording a new layer of shotcrete is applied to the sides of the tunnel. In the first part of the recording the GA Normlifter is moved out of the way and the machine that applies the shotcrete moves forward. It is followed by a concrete mixer. Eventually the concrete is shot at the walls of the tunnel.

Sound: Kathinka Engels
Photo and Video: Konrad Gutkowski

Specs:

Decade:
Filesize:
Duration:
Channels:
2010s
123.7 MB
5 min 22 s
2 (Stereo)
Sample rate:
Bit rate:
Bit depth:
96 kHz
3072 kb/s
16 bit

Recorded on March 12, 2018
Ulmer Straße 269
Stuttgart, GERMANY
Creative Commons License