Royal Guard Parade in Stockholm (2)
his is the guard parade that goes from central Stockholm up to the Stockholm (or Royal) Palace, ending with the changing of…

Virtsu2 wind farm is located in Lääne county in Estonia. It was completed in 2008. There are three Enercon E-70 type wind turbines with the capacity of 2.3 MW in Virtsu2 wind farm. Yearly production of electricity is ca 21 GWh. The wine farm comprises an area of 20 hectares.
The electric turbines are producted by a German company Enercon GmbH. The height of the mast of the wind turbine is 85m, rotor diameter 71m. Weight of the wind turbine is 2.30 tons. The expected life-span of the wind turbines of Virtsu2 wind farm is 20 years.
Virtsu2 wind farm is operated by Nelja Energia OÜ.
Wind speed was about 5-7m/sec. while recording.
Sound recordist: Leena Ahonen
Video recordist: Leena Ahonen
Photographer: Leena Ahonen
his is the guard parade that goes from central Stockholm up to the Stockholm (or Royal) Palace, ending with the changing of…
The world’s first traffic light was installed in London in 1868. The first in Sweden became operational in 1925. Sound signals to…
The projector used in the Nova is an Italian Cinemeccanica projector, Victoria 9 model, one of the last models produced by this…
The sound accompanying a ride in the cab of FSR Tarpan 233 van. The recording was realized in the National Museum of…