Pneumatic pick hammer
The sound of a pneumatic pick hammer hacking into the coalface. It was manufactured by Ravne Ironworks in 2005. It is used…

A free-standing, hand-operated level-crossing barrier fitted with Südbahnwerk advance-warning ringing apparatus, manufactured in the 1880’s.
It was used in the Celje region until the 1950’s and entered the collection of the Slovene Railway Museum in 1989 after storage in the Signalling & Telecommunication Depot, Celje.
Sound of barrier lifting: By turning the (adjustable) handle on the cog drive in the opposite direction, the barrier is put in action via a chain transmission. The advance warning ringing apparatus is switched off.
Sound level: 66,3 dB
Sound recordist: Boštjan Troha
Photographer: Neža Renko
Video recordist: Barbara Grilc
The sound of a pneumatic pick hammer hacking into the coalface. It was manufactured by Ravne Ironworks in 2005. It is used…
Stuttgart 21 is one of the biggest construction projects in Germany. It includes the underground construction of a new central station for…
For more than 160 years Hörde in the suburbs of Dortmund has been a site for iron and steel production. The blast…
A group of Togolese protesters chose the World Climate Conference in Bonn (COP23) as an occasion to protest against the Togolese president…