Pneumatic traction unit
The sound of a pneumatic traction unit in operation. It was manufactured by the Czech Brano Group in 2000. It is indispensable…

Stuttgart 21 is one of the biggest construction projects in Germany. It includes the underground construction of a new central station for the city of Stuttgart as well as the creation of a new network of tracks and tunnels that allows high speed trains to pass in the area, possibly reduces travelling times and connects Stuttgart to international transport networks. It is conducted by Deutsche Bahn and co-financed by public money.
However, despite enthusiasm from its founders and the industry, the project has been heavily criticised. Not only has it become much more expensive than expected, but there are also doubts about the efficiency and safety of the new central station as well as about the actual benefit of the high speed tracks. Moreover, the construction fuelled protests and many discussions on protected buildings and nature reserves within the city such as historic parks.
One of the main construction sites of the project is a new bridge over the river Neckar. The bridge, which is made from steel and concrete, is supposed to connect the new central station and Stuttgart-Bad Cannstadt. In this recording you can hear the sound of an angle grinder as it is used to grind the steel construction of the bridge.
Sound: Konrad Gutkowski
Photo and Video: Kathinka Engels
The sound of a pneumatic traction unit in operation. It was manufactured by the Czech Brano Group in 2000. It is indispensable…
The flyer, manufactured in 1910 by the Alsace company Société Alsacienne de construction mécaniques, Mulhouse (France) was in use at the Litija…
The sound of the engine of Prinz NSU 1200 c, 1969. Its current owner, Denis Rozina from Ljubljana, imported it from Germany.…
In the recording you’ll hear a show competition between two lumberjacks who are trying to cut sticks that resemble branches with minimum…