Wola Duchacka bus depot – a bus wash
Sounds recorded while a Solaris Urbino 18 bus is going through the bus wash at Wola Duchacka depot. Between 7.00 p.m. and…

The hoist, which was built cooperatively by the Gutenhoffnungshütte (GHH) and the company AEG (construction by GHH, Elektrik: AEG) in the 1980s, is in use in shaft 10 of the Prosper-Haniel colliery. It manages the transportation of people, coal and material inside the shaft.
In order to enter and exit the mine (men hoisting) there is an electric drive engine, which can move one cage up and another cage down at the same time. Both cages are attached at different places on a steel cable and are also connected by a weight-compensation cable. The steel hoisting cable is conducted by a pulley hanging from the head frame.
When the motor-driven steel drum of the hoist turns, the cable is put in motion, which moves one cage downwards and the other cage upwards.
The entire hoisting system is controlled by a computer. The hoist operator supervises the procedures and is able to step in when a problem occurs during operation.
The sounds of the hoist are made by the drive engine and the turning of the cable drum. These sounds will be heard at the Prosper-Haniel colliery until 2018. Then, anthracite coal mining in Germany will come to an end.
Sound recordist: Konrad Gutkowski
Photographer: Konrad Gutkowski/Julian Blaschke
Sounds recorded while a Solaris Urbino 18 bus is going through the bus wash at Wola Duchacka depot. Between 7.00 p.m. and…
The mechanism of a Hermle pendulum quartz clock. It was probably manufactured in the second half of the 20th century. The quartz…
The washed parts are dried with a compressed air gun. It is the bike cassette which is dried here. The cassette matches…
The Adler embroidery machine, model 9-35 (built around 1900), was operated by women in the Vereinigten Wäschefabriken (United Linen Works) Juhl &…