LH Standard tram – car interior
Sounds accompanying the ride of a passenger in the power car of LH Standard tram. The recording was realized during the ride…

The operation of pumps which dose the raw water coagulant in the coagulation building. The raw water from the intake on the Rudawa River is pumped into the coagulation building. The coagulant (poly-aluminium chloride) decreases the turbidity of the water, heightens colour intensity, removes organic impurities and micro-impurities.
The recording was made at the Rudawa Water Treatment Plant, which is part of Krakow waterworks. The water intake is located on the Rudawa River, the left tributary of the Vistula. The raw water from the intake is subjected to a treatment process which consists of oxidation, coagulation, sedimentation, filtration and disinfection. ZUW Rudawa is one of four treatment plants that provide drinking water for Krakow. Tap water in Krakow is of high quality and good for drinking. Its parameters are monitored on an ongoing basis by the Central Laboratory of Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji in Krakow. ZUW Rudawa produces an average of 22,000 - 28,000 m3 of water per day and supplies about 200,000 inhabitants.
The information comes from: https://zuwrudawa.wkraj.pl/#/64541/0
Sound recording: Monika Widzicka
Photo: Piotr Żabicki
Sounds accompanying the ride of a passenger in the power car of LH Standard tram. The recording was realized during the ride…
Stuttgart 21 is one of the biggest construction projects in Germany. It includes the underground construction of a new central station for…
This floating drydock at Gotenius shipyard in Gothenburg was built 1897. It’s a type of pontoon for dry docking ships. Shipyards operate…
In the final stage of shoemaking, the shoemaker finely trims the leather sole to smooth it and give it ultimate shape with…