Wooden wagon
The sound of wagon on the pavement. The recording was realized in the National Museum of Agriculture and Agricultural-Food Industry in Szreniawa…

Piling the first concrete pile. The ground is very soft and the concrete pile is sinking fast.
This recording was made at a construction site where an eleven floors house is being built. The traffic in this area is heavy and because of that you can here traffic in the background.
A pile driver is a mechanical device used to drive piles (poles) into soil to provide foundation support for buildings or other structures. The term is also used in reference to members of the construction crew that work with pile-driving rigs.
This machine is manufactured by Junttan company's which roots reach back to the 1960s to a Finnish foundation company called Savon Varvi. Export to Sweden and Denmark started in 1984.
Junttan PM 23 LC “Hercules” is a special piling rig designed for job sites where a long leader reach is needed. The rig can be used for driving timber, concrete and different types of steel piles. The recommended hammer ram weight is from 3 000 to 5 000 kg and maximum pile length is 20 meters.
Sound recordist: Torsten Nilsson
Photographer: Torsten Nilsson
Video recordist: Torsten Nilsson
The sound of wagon on the pavement. The recording was realized in the National Museum of Agriculture and Agricultural-Food Industry in Szreniawa…
The sound of the revolving platform is recorded from below the revolving stage. It is powered by an electrical motor and runs…
For more than 160 years Hörde in the suburbs of Dortmund has been a site for iron and steel production. The blast…
The projectionist first turns the machine by hand, to check that everything is alright, and to ensure that the film is properly…