Möllevångstorget- Soundscape
Möllevångstorget can be considered a multi-cultural center in the town of Malmö. During the day fruits and vegetables are being sold in…

Over the railway, near the Tampere train station, a complex of buildings called Kansi is being built. The complex will have offices, shops, hotels, marketplaces and a brand new arena called Areena.
The multi-use arena is going to be nearly 50.000m2 large with more than 10.000 seats inside. The entire complex is going to be 110.000m2 and the costs are more than 500 million euros.
Construction will end in autumn 2021.
In the audio a pile-driver is placing metal bars into the ground.
Sound recorder, video recorder, photographer: Mikael Maffei
Möllevångstorget can be considered a multi-cultural center in the town of Malmö. During the day fruits and vegetables are being sold in…
Last step is to roll the host and after that it can be loaded back to the fire truck. Sound level: 74…
The sound of gas-fired burners heating the furnace to 700°C. When remelting is completed, an ingot is loaded in a furnace to…
620T Export Made by Wilhelm Brocksieper GmbH, Germany in 2009. Table version of shoemakers press. It operates with compressed air and presses…