Signal and gate, train crossing
Early railway level crossings had a flagman in a nearby booth who would, on the approach of a train, wave a red…

The recording was made at the heat and power plant PGE Energia Ciepła S.A. located in Krakow. The combined heat and power plant is the largest producer of heat and electricity for Krakow, it meets the needs of over 70% of residents, companies and institutions.
Water collected from the Białucha River is transported via two pipelines to the combined heat and power plant in order to be used for the production of electricity and heat. The maximum possible water consumption is 15.600 m3 / day.
Sound recording: Monika Widzicka
Photo: Piotr Żabicki
Early railway level crossings had a flagman in a nearby booth who would, on the approach of a train, wave a red…
This is the soundscape of how it sounds being a viewer of the annual pride parade in Stockholm. The soundscapes stretches for…
From a quiet soundscape to another; walking towards the water one can find a newly-built bridge, and at the other side there…
The bell on a historic LH Standard tram recorded outside the car. The Linke Hofman Standard tramcars were manufactured in the years…