Thickness Planer (Wooden Box)
Manufacturer: Himmelwerk dB: 94 – 96.9 Recording distance: 1,5m After oiling the belt of the planer, the planks are fed through to…

Sounds recorded when lifting and lowering a Solaris Urbino 18 bus using an electric lift.
The sounds were recorded in the main repair hall at Wola Duchacka depot in Krakow. The facility was opened in 1980 and since then it has been the largest bus depot in Krakow. On the premises there are repair halls, a bus wash, a bus park, a petrol station, an electric bus charging station, a waiting room for drivers and offices.
Sound recording: Monika Widzicka
Photo: Piotr Żabicki
Manufacturer: Himmelwerk dB: 94 – 96.9 Recording distance: 1,5m After oiling the belt of the planer, the planks are fed through to…
The sound of welding. Before the electroslag remelting (ESR) process starts, a consumable wire electrode is first welded to a special holder…
The Sankyo Sound 502 movie projector was bought in January 1979 in Brussels (10.900 Belgian francs). It was used to project Super…
In September 2017 the Thyssenkrupp AG announced their plans for a fusion with the Indian steel cooperation Tata. The employees, the works…