Extinction Rebellion Action december 9t Part 3
Extinction Rebellion is a global organization founded in the united kingdom the 31:th of October 2018. Since then it has grown in…

Stuttgart 21 is one of the biggest construction projects in Germany. It includes the underground construction of a new central station for the city of Stuttgart as well as the creation of a new network of tracks and tunnels that allows high speed trains to pass in the area, possibly reduces travelling times and connects Stuttgart to international transport networks. It is conducted by Deutsche Bahn and co-financed by public money.
However, despite enthusiasm from its founders and the industry, the project has been heavily criticised. Not only has it become much more expensive than expected, but there are also doubts about the efficiency and safety of the new central station as well as about the actual benefit of the high speed tracks. Moreover, the construction fuelled protests and many discussions on protected buildings and nature reserves within the city such as historic parks.
Large parts of the train tracks arriving at the new station will run through underground tunnels. One of the construction sites was at Ulmer Straße just outside of the city centre. When working underground groundwater always is an issue. In this recording you can hear water running from the walls of the tunnel.
Sound: Kathinka Engels
Photo and Video: Konrad Gutkowski
Extinction Rebellion is a global organization founded in the united kingdom the 31:th of October 2018. Since then it has grown in…
The sound of stretching the upper in the boot. The recording was realized in Adam Cieślak’s Shoe Uppers Repair Shop at 3…
The sound of opening and closing doors in the PESA 2014N tramcar dubbed Krakowiak recorded in Podgórze depot in Krakow. Krakowiak is…
Year of manufacture: before 1900, unknown Floor dimensions: 460 mm x 560 mm (length x width) Weight: about 110 kg Maximum bore…