H.C. Ørsted engine – running
Engine running 0 - 1:45 Recorded on 10 meters distance Engine run 1.45- 3.33 Walking around close to the engine. From its…

Stuttgart 21 is one of the biggest construction projects in Germany. It includes the underground construction of a new central station for the city of Stuttgart as well as the creation of a new network of tracks and tunnels that allows high speed trains to pass in the area, possibly reduces travelling times and connects Stuttgart to international transport networks. It is conducted by Deutsche Bahn and co-financed by public money.
However, despite enthusiasm from its founders and the industry, the project has been heavily criticised. Not only has it become much more expensive than expected, but there are also doubts about the efficiency and safety of the new central station as well as about the actual benefit of the high speed tracks. Moreover, the construction fuelled protests and many discussions on protected buildings and nature reserves within the city such as historic parks.
One of the main construction sites of the project is a new bridge over the river Neckar. The bridge, which is made from steel and concrete, is supposed to connect the new central station and Stuttgart-Bad Cannstadt. This recording is a soundscape of the construction site.
Sound: Kathinka Engels
Photo: Konrad Gutkowski
Engine running 0 - 1:45 Recorded on 10 meters distance Engine run 1.45- 3.33 Walking around close to the engine. From its…
Wagner Dortmund LP 100/4/1,6 1-1174 Max. dB 81,8 Max. pressing force 100 000 kg In use in 1962-2015. Screen plates are used…
The “Blaupließtbock” from the 1910s is in use in the knife factory Windmühlenmesser Robert Herder in Solingen (Germany North Rhine-Westphalia). It is…
This sound was recorded in a simulation room at Ringhals nuclear power plant in Ringhals Sweden. This is the sound that alerts…