Häme bridge restructuration to make way for a new tram line continues in Tampere. In March 27, 2018 the Tammerkoski rapid was dried to allow the construction team to build a temporary working platform, making it possible for them to work under the bridge even when the rapids are still flowing.
Three excavators are working simultaneously: One, drilling the poles in to the ground, the second passing the poles and the third moving big rocks away from the drilling zone.
Works will continue until the end of 2019.
Sound recorder, video recorder, photographer: Mikael Maffei
Manufacturer: Bäuerle dB: 90 95.2 Recording distance: 2m The circular saw is needed for the fifth step of crafting this wooden box.…
Engine sound recorded close to engine. 2.30 Leaving harbour 14.40 Move away from engine KarlA (TG1) Built with drawings from 1920s. Shipyard:…
Container ship gantry crane is loading a container ship M/S Sandy Rickmers, flaged to Marshall Islands. Crane is made in 1996 by…
In December 2018 Prosper Haniel, the last active coal mine of the Ruhr area, was closed down. Before the end “Sounds of…