Arvinsalmi Cable Ferry
The history of cable ferries date all the way back to 13th century. In Finland ferries have been around since the 16th…

The sound of emptying steel scrap from a truck.
The steel scrap is supplied to the plant most usually by lorry. The scrap is emptied from a skip truck and transferred by crane to a steel scrap dump.
Metal Ravne is the legal successor to Železarna Ravne. The company's range includes a steel plant programme, which starts the production of all their rolled and forged products. Due to technological modernisation over recent years, the company has all the most important machinery for the production of high-quality steel, including a 45t UHP electric arc furnace, a vacuum ladle furnace and a state-of-the-art ‘teeming pit’ for high-class conventional ingots. Their range of products includes ingots, billets with rounded edges and wide flats, with round, flat and square sections, forged bars, machined forgings, discs, bushes, etc.
Sound recordist: Dušan Oblak
Photographer: Veronika Štampfl
Video recordist: Barbara Grilc
The history of cable ferries date all the way back to 13th century. In Finland ferries have been around since the 16th…
The bearings on H.C. Ørsted engine are pressure lubricated at a pressure of 2.5 bar. The 40 tons content of the lubricating…
Finnish Lapland is one of the few places in Europe, where there is enough gold to be found using just shovel and…
In the second stage of hose maintaining the hose is filled with water. A fire hose is a high-pressure hose that carries…