Air central station construction pipes Stuttgart 21 Train Transport underground tunnel Ventilator

Stuttgart 21 XV: Ventilator at Tunnel Construction at Ulmer Straße

Stuttgart 21 is one of the biggest construction projects in Germany. It includes the underground construction of a new central station for the city of Stuttgart as well as the creation of a new network of tracks and tunnels that allows high speed trains to pass in the area, possibly reduces travelling times and connects Stuttgart to international transport networks. It is conducted by Deutsche Bahn and co-financed by public money.
However, despite enthusiasm from its founders and the industry, the project has been heavily criticised. Not only has it become much more expensive than expected, but there are also doubts about the efficiency and safety of the new central station as well as about the actual benefit of the high speed tracks. Moreover, the construction fuelled protests and many discussions on protected buildings and nature reserves within the city such as historic parks.
Large parts of the train tracks arriving at the new station will run through underground tunnels. One of the construction sites was at Ulmer Straße just outside of the city centre. In this recording you can hear the rushing sounds of the over ground pipes of the large ventilator that supplies fresh air for the workers underground.

Sound: Kathinka Engels
Photo: Konrad Gutkowski

Specs:

Decade:
Filesize:
Duration:
Channels:
2010s
65.6 MB
1 min 53 s
2 (Stereo)
Sample rate:
Bit rate:
Bit depth:
96 kHz
4608 kb/s
32 bit

Recorded on March 12, 2018
Ulmer Straße 269
Stuttgart, GERMANY
Creative Commons License